RAF Standardı (Secondary Certification - CCS)

Genel
Yönetmelikler
Etko Dokümanları
Kontrol ve Sertifikasyon Süreci

Responsible Animal Fiber (RAF)

Responsible Animal Fiber (RAF) is a framework to cover standards which address animal fibers. RAF includes Responsible Wool Standard (RWS) and Responsible Mohair Standard (RMS) certiication.


The Responsible Wool Standard (RWS) and The Responsible Wool Standard(RMS) are a voluntary standard that addresses the welfare of sheep and the land they graze on.

The goals of the Responsible Mohair Standard and Responsible Wool Standard are to provide the industry with a tool to recognize the best practices of farmers; ensuring that mohair comes from farms that have a progressive approach to managing their land, practice holistic respect for animal welfare of the goats and respect the Five Freedoms of animal welfare.


The RWS/RMS requires all sites to be certified, beginning with the wool farmers and through to the seller in the final business to business transaction. Usually the last stage to be certified is the garment manufacturer or brand.ETKO certifies RMS and / or RWS certified products in post farm supply chains within the scope of CCS certification.


CATEGORIES

  • Textile products
  • Leather products
  • Paper products
  • Plastic products

COUNTRY SCOPE

  •        Albania
  •      Austria
  •      Australia
  •        Azerbaijan
  •       Belgium
  •        Bosnia
  •        Cambodia
  •        Canada
  •        China
  •        Croatia
  •        Cyprus
  •        Czech Republic
  •        Denmark
  •        Egypt
  •        Estonia
  •        France
  •        Germany
  •        Greece
  •        Hungary
  •        Ireland
  •        Italy
  •        Kazakhstan
  •        Kuwait
  •        Kyrgyzstan
  •        Latvia
  •        Lithuania
  •        Luxemburg
  •        Macao
  •        Malta
  •        Moldova
  •        Netherlands
  •      New Zealand
  •        North Macedonia
  •        Norway
  •        Poland
  •        Portugal
  •        Romania
  •        Saudi Arabia
  •        Serbia
  •        Slovakia
  •        Slovenia
  •        Spain
  •        Sri Lanka
  •        Switzerland
  •        Tajikistan
  •        Turkey
  •        Turkmenistan
  •        Ukraine
  •        United Arab Emirates
  •        Qatar
  •        Uzbekistan
  •        Vietnam
  •        U.S.A
CCS-201-V3.0-CCS-User-Manual Terms and Definitions for Textile Exchange Standards and Related Documents CCS-Content Claim Standard Certification Procedures CCS-101-V3.1-Content-Claim-Standard ASR-213-Materials-Processes-and-Products-Classification RAF-104-V2.0-RAF-Transition-Policy RAF-102-V2.1-RAF-Certification-Procedures RWS-RMS-Supply_Chain_Certification RAF-101b-V1.2-Responsible-Mohair-Standard RAF-201b-V1.2-RMS-User-Manual RAF-101a-V2.2-Responsible-Wool-Standard RAF-201a-V2.2-RWS-User-Manual Document List Standards Claims Policy Standards Logo Use Specifications ASR-109a-V3.2 Guidance: Auditing During the COVID-19 Pandemic TE-405-V1.0-Quick-Guide-to-Product-Labeling-and-CCS-3.0 TE-405-V1.0-Quick-Guide-to-Product-Labeling-and-CCS-3.0 Quick-Guide-to-Product-Labeling-and-CCS-3.0 RAF-405-V1.0-RAF-Brand-Sourcing-Guide-V1.0 Quick Guide to Product Labelling & CCS 3.0 ASR-103-V3.0-Policy for Scope Certificates ASR-104-V3.0-Policy-for-Transaction-Certificates CCS-105-Policy for Alternative Volume Reconciliation List of Banned Organizations V2022.5 ASR-107-V2023.0-Certification-Fee-Structure ASR-106-V2.3 Accepted Equivalent Standards Policy Textile Exchange Guidance Regarding the Suspension of CU India CCS 105-Policy for Alternative Volume Reconci v3.1 CCS 102- Certification Procedures v3.1 RAF 102-RAF Certification-Procedures.V2.2 TE 302-Standards Logo Use Specification V1.3 TE 301-Standards Claims Policy V1.3 TE 201 Document List Public.v2023.1 TE-201- Document List - Public.V2023.4 ASR-221-V2023.7-Calibration-Log ASR-225-V2023.3-List-of-Banned-Organizations TE-201-V2023.7-Document-List-Public ASR-221-Calibration Log.V2023.10 ASR-225-V2023.4 List of Banned Organization TE-406-V1.1 Quick Guide to Brand Certification and CCS-3.0 TE-201- Document List - Public.V2023. 6 ASR-221-V2023.9-Calibration-Log TE-201-Document List Public.V2023.5 ASR-214- Geographic ClassificationV1.2 ASR-221-Calibration Log.V2023.8 ASR-213-Materials, Processes and Products Classification V1.2 ASR-104-Policy for Transaction Certificates V3.1 ASR-107-Certification Fee Structure V2024.0 ASR-103-Policy for Scope Certificates V3.1 CCS-201-V3.1-CN-CCS-User-Manual-Chinese-中文 TE-201-V2024.1-Document-List-Public ASR-221-V2024.1-Calibration-Log ASR-221-V2023. 11 Calibration Log CCS-201-V3.1- CCS-User-Manual TE-201- Document List Public.V2024.2 ASR-221- Calibration Log.V2024.2 ASR 113-V1.0 Policy for the Use of eTrackit
ETKO Certification ServicesCatalogue of MeasuresAnti-Bribery and Corruption PolicyApplication Form for Objection & Complaint & AppealStatement of Impartiality Product SpecificationApplication Form Use of Logo, Licences, Mark of Conformity
FIRST CONTACT AND OFFER
  1. Enter the enterprising here to make sure that the information about the product is written.
  2. Sending general information and application form at the first contact
  3. For the entrepreneur application and application form
  4. Preparing and submitting the price offer
  5. Approval of the price offer

APPLICATION
  1. The entrepreneur should submit the document requested by ETKO as soon as possible.
  2. Entrepreneur transmits Production Information
  3. Entrepreneur Transmits Business Information (Operating lines, Layout Plan etc. other documents)
  4. Completing the Application File
CONTROL
  1. Check date and inspector determining
  2. Control and Sampling of Products
  3. Control of Enterprises (Warehouses, Documentation, Stock Status etc.)
  4. Control of Entry and Exit and Sales
  5. Preparation of the report of the control
CERTIFICATION
 
The Personnel Involved in the Approval of Control and Control Reports cannot take place in Certification. Certification Committee is Completely Independent.
  1. Departing the Control Report
  2. Certification Committee Approval
  3. Submission of the Report and Certificate
  4. Beginning of Sales Transactions